Five steps. No improvisation.

A remodel goes wrong in the gaps — between designer and builder, between drawing and site, between what was said and what was written. Our method is built to close them.

01

Discover

We walk the property with you, measure what exists, and talk about how you actually live in it rather than how the plan says you should. We look at structure, services, light and the constraints of your lot, and we give you an honest read on whether the project you have in mind is the right one.

Typically one to three weeks, depending on scheduling and scope.

What you receive

  • Existing-conditions notes and measured survey
  • A written scope summary in plain language
  • A budget band, not a false precision number
  • A clear statement of what is uncertain and why
02

Design

We develop plan options before committing to one. You see layouts, elevations and material direction, and every option comes with buildability and cost feedback from the people who will construct it. This is where the project is actually decided — not on site.

Typically three to eight weeks, longer on whole-home and addition scopes.

What you receive

  • Two or three plan options, then one developed scheme
  • Elevations, key sections and 3D views
  • Material and fixture direction with real alternatives
  • An updated cost picture as the design firms up
03

Plan

Engineering, energy compliance, permit submission and plan-check responses, alongside procurement of anything with a long lead time. We build the programme here: a dated, sequenced schedule with the trades named and the inspection points marked.

Permitting varies widely by jurisdiction, scope and plan-check workload — several weeks to several months is a realistic range in Los Angeles.

What you receive

  • Technical drawings and engineering
  • Permit submission and plan-check management
  • A line-item build sheet you can read and question
  • A dated construction programme with milestones
04

Build

One crew, one schedule, one accountable site lead. Work proceeds in the order the building requires: demolition, structure, rough services, inspections, close-up, then finishes. You get a weekly written report and a site that is cleaned down every day.

Weeks for single-room scopes; several months for whole-home and addition projects. Your programme will carry real dates.

What you receive

  • Weekly written progress report with photographs
  • A named site lead and a single point of contact
  • Written variations before any cost change is incurred
  • Inspection sign-offs as they are obtained
05

Finish

Commissioning, the punch list, and the installation of in-house printed surfaces last so they are not damaged by trades working around them. We do not call a project complete because the schedule says so — we call it complete when the list is empty.

Typically one to three weeks after substantial completion.

What you receive

  • Joint punch-list walk and completion of every item
  • Appliance and system commissioning
  • Warranties, manuals and as-built notes
  • A follow-up check after you have lived in the space

What to expect

How it feels to have us in your house.

The technical work is only half of it. The other half is whether you know what is happening, and when.

Communication

One named point of contact for the whole project, a weekly written report during construction, and replies within one business day. No group texts, no chasing, and no finding out about a problem after it became expensive.

Schedules

You get a dated programme before construction starts, with milestones and inspection points marked. When something moves — and on a real building site something always moves — you get the revised date and the reason, not silence.

Change management

Nothing that changes the price happens without a written variation you have approved first. Discoveries behind walls get documented with photographs, options and cost impact. An agreed contingency exists precisely so surprises do not become arguments.

Questions

About how we work.

01

Do you charge for design?

Design is real work and is treated as such rather than being buried in a construction number. We agree the design fee and its scope in writing before starting, so you know what you are buying and what you own at the end of it.

02

Can I use my own architect?

Yes. We work alongside external architects and designers regularly. Where we are building to someone else's drawings we review them for buildability first and raise issues before they become site problems.

03

How do you handle permits?

We prepare the submission, file it, and manage plan-check responses and inspections. Requirements and timelines vary between the City of Los Angeles and the independent cities, so we confirm the applicable path for your address before promising a date.

04

What happens if something is found behind a wall?

You get it in writing, with photographs, options and cost impact, before work continues. Old homes hide things; the difference between a good and a bad project is how that is handled, not whether it happens.

Start Here

Thinking about remodeling? Start with a conversation.

Tell us the room, the street and roughly when. We'll come back with a realistic range and the next honest step.