Deco Print Renovations designs and builds Los Angeles kitchens plan-first. We start with where you cook, where people gather and where the light comes from, then resolve structure, ventilation, electrical and plumbing before a single cabinet is specified. Finish work is the last decision, so the remodel fixes the layout rather than hiding it.

Overview

Most Los Angeles kitchens fail for the same reason: they were laid out for a smaller household, a closed floor plan and appliances that no longer exist. A cosmetic refit hides that. A remodel fixes it.

We start with the plan — where you cook, where people gather, where the light comes from — then resolve structure, ventilation, electrical and plumbing before a single cabinet is specified. The finish work is the last decision, not the first.

What's included

  • Measured survey and existing-conditions drawings
  • Plan options, elevations and 3D views of the proposed kitchen
  • Structural design where walls, beams or openings change
  • Electrical, plumbing, gas and ventilation coordination
  • Cabinetry and appliance specification and procurement
  • Stone or solid-surface templating, fabrication and installation
  • Permits and inspections where the scope requires them
  • Optional in-house UV-printed backsplash or feature panel

01 / Design phase

Design before demolition.

Kitchen design starts with cooking, storage, circulation and light. We coordinate appliance dimensions, cabinetry, ventilation, outlets and structural changes before the build is scoped. A printed backsplash is considered alongside counters and lighting, with material suitability and a physical proof reviewed before production.

02 / Build phase

A sequence the room can support.

The build follows demolition, any approved structural work, rough services and relevant inspections before close-up and cabinetry. Counters and custom glass may need field measurements after installation of adjacent elements. Procurement, access and temporary kitchen arrangements are discussed before work begins.

Method

Our process for kitchen remodeling.

Consultation — Review the address, photographs, goals, access and budget priorities. Establish the scope and which information is still needed.

Design — Develop the preferred direction and coordinate the details. An island versus a peninsula: circulation and seating before appearance. Record selections, material suitability and any proof approvals.

Permits — Confirm the authority and approvals required for the actual work. Coordinate technical documents and procurement; a decorative finish may not require a permit, but associated work can.

Build — Follow the agreed scope and sequence, with required inspection points and written approval of changes. Protect adjacent rooms and schedule bespoke finishes around final measurements.

Reveal — Review the completed scope, address the punch list and explain the care instructions, product information and written warranty terms that apply.

01Step

Discover

Walk the kitchen, record how you actually cook and host, agree scope and a realistic budget band.

02Step

Design

Two or three plan options, then one developed scheme with elevations, appliance schedule and material boards.

03Step

Plan

Structural and service drawings, permit submission where required, trade scheduling and a line-item build sheet.

04Step

Build

Demolition, structure, rough services, inspections, joinery installation, then stone templating from installed cabinets.

05Step

Finish

Appliance commissioning, punch list, printed surfaces installed last, then handover with warranties and as-built notes.

Los Angeles

Considerations here, specifically.

Permit rules, review times and requirements vary by city and by scope. We confirm the current path for your address during design.

  • Removing a wall between a kitchen and a living area is usually structural work. It needs engineering and a permit, and that shapes the calendar more than any finish selection will.
  • Permit requirements and review times vary by jurisdiction — the City of Los Angeles (LADBS) and cities such as Burbank, Glendale, Pasadena and Santa Monica each run their own process. We confirm the applicable path during design.
  • Design and permitting commonly take several weeks to a few months depending on scope and plan-check load; on-site construction for a full kitchen commonly runs a couple of months or more. Both vary by scope.
  • Stone templating happens after cabinets are installed, and fabrication takes time after that. No schedule that promises stone on day one of joinery is real.
  • Homes built before the 1980s frequently need electrical service and plumbing upgrades to support a modern kitchen. It is better to find that in design than in demolition.

Planning

Timeline & cost drivers

Allow several weeks to a few months for design and any permit review, followed by a couple of months or more on site for a full kitchen. A surface-only refresh is a different scope. Agency corrections, cabinetry delivery and counters measured after cabinet installation all affect the sequence; these are planning ranges, not promised dates.

Moving a sink, gas line or wall costs differently from retaining the layout. Electrical capacity, ventilation routes, cabinet construction, appliance specifications and stone fabrication are major decisions. Compare those items before choosing finishes, and separate allowances and concealed-condition contingency from optional upgrades.

Design decisions

Design options we're asked about most

  • An island versus a peninsula: circulation and seating before appearance
  • Full-height storage versus an open shelf: capacity, light and daily upkeep
  • Layered task and ambient lighting coordinated with outlets and ventilation
  • A printed glass or tile backsplash proofed alongside counters and cabinetry

Questions

Straight answers.

01

How does kitchen design connect to the build phase?

Layout, cabinetry, appliances, ventilation, services and structural questions are coordinated during design. The build then follows the agreed scope, relevant permits and inspection sequence, with field measurement for bespoke surfaces where required.

02

How long does a kitchen remodel take?

It depends on scope. A like-for-like replacement is far shorter than a remodel that moves walls, plumbing and gas. Expect design and permitting to run several weeks to a few months, and on-site work for a full structural kitchen remodel to run a couple of months or more. We give you a scheduled, dated programme before the build starts rather than a generic range.

03

Do I need a permit to remodel my kitchen?

Usually yes for anything beyond surface finishes — electrical, plumbing, gas and any structural change generally require permits. Requirements differ between the City of Los Angeles and the surrounding cities, so we verify the current requirement for your address during design.

04

Can I stay in the house during the work?

Many clients do. We set up dust protection, agree a temporary kitchen arrangement and stage the work to keep the rest of the house usable, but there will be periods without kitchen services. We tell you exactly when those fall in the programme.

05

Can you print a custom backsplash?

Yes — that is our signature capability. We run UV direct-to-surface printing in house, so a backsplash, feature panel or printed glass splash can be proofed with your designer and installed by the same crew that built the kitchen.

06

What warranty information should I ask for before work starts?

Ask for the written workmanship terms, product warranties, exclusions and the process for reporting a concern. Coverage and duration depend on the agreement and specified products; do not assume a universal term. Keep the scope, approvals and care instructions with your handover records.

07

How should I check insurance before a remodel?

Request current insurance documentation and confirm that it applies to the agreed work before signing. Discuss any homeowner-policy requirements with your own insurer, including occupancy and temporary accommodation. A website description is not evidence of coverage; the project documents need to answer that question.

08

How is an estimate developed into an agreed price?

Start with the address, photographs, intended scope and priorities. Survey information and design decisions make the estimate more specific. The proposal should identify inclusions, exclusions, allowances, permit and consultant costs, and how changed conditions are authorized. An early budget conversation is not a fixed construction quote.

Start Here

Thinking about remodeling? Start with a conversation.

Tell us the room, the street and roughly when. We'll come back with a realistic range and the next honest step.