Los Angeles & San Fernando Valley Design-Build Call (833) 332-6774
Renovated interior living space with built-in joinery

Home · Services · Interior Remodeling

Interior Remodeling

Interior remodeling covers the work between decorating and construction. Deco Print Renovations re-plans rooms, makes non-structural and structural wall changes, and adds built-in joinery, flooring, lighting design and printed surfaces for homes where the rooms are the wrong shape, storage is misplaced or the lighting never worked after dark.

Overview

Not every project needs new floor area or a new kitchen. Sometimes the problem is that the rooms are the wrong shape, the storage is in the wrong place and the lighting was installed by someone who never stood in the room after dark.

Interior remodeling covers the work between decorating and construction: re-planning rooms, non-structural and structural wall changes, built-in joinery, flooring, lighting design and printed surfaces.

What's included

  • Room-by-room plan review and re-planning
  • Wall removals and openings, with engineering where required
  • Built-in joinery design and fabrication
  • Flooring, plaster and finish specification
  • Lighting and electrical design
  • Millwork, doors, trim and hardware
  • In-house printed feature walls and panels

Method

Our process for interior remodeling.

Consultation — Review the address, photographs, goals, access and budget priorities. Establish the scope and which information is still needed.

Design — Develop the preferred direction and coordinate the details. Connected living rooms versus a larger uninterrupted space. Record selections, material suitability and any proof approvals.

Permits — Confirm the authority and approvals required for the actual work. Coordinate technical documents and procurement; a decorative finish may not require a permit, but associated work can.

Build — Follow the agreed scope and sequence, with required inspection points and written approval of changes. Protect adjacent rooms and schedule bespoke finishes around final measurements.

Reveal — Review the completed scope, address the punch list and explain the care instructions, product information and written warranty terms that apply.

01Step

Discover

Walk the rooms and identify what is actually wrong — plan, storage, light or finish.

02Step

Design

Re-planning, joinery design, lighting layout and material selection.

03Step

Plan

Engineering and permits where openings change, procurement and a dated schedule.

04Step

Build

Strip-out, framing, electrical, plaster and flooring in sequence.

05Step

Finish

Joinery installation, printed surfaces, decoration, punch list and handover.

Los Angeles

Considerations here, specifically.

Permit rules, review times and requirements vary by city and by scope. We confirm the current path for your address during design.

  • Any wall you want to remove is a structural question until an engineer says otherwise. Assume nothing from the age or thickness of the wall.
  • Lighting is the cheapest large improvement in most interiors and the one most often left until the electrician asks.
  • Older plaster and lath behaves differently from drywall. Repair strategy affects both cost and finish quality.
  • Non-structural interior work often needs fewer permits, but electrical and any structural change generally still do. Requirements vary by city.
  • Interior remodels typically run several weeks to a few months on site depending on the number of rooms and whether structure changes.

Planning

Timeline & cost drivers

Interior remodeling commonly takes several weeks to a few months on site, depending on the rooms involved and whether structure changes. Survey, design, any required permits and procurement come first. Joinery lead times, repairs to old plaster and staged access can influence the finish date more than the size of the room.

Moving walls, adding engineered openings, replacing electrical circuits and repairing substrates are different costs from repainting. Bespoke joinery, floor transitions, doors and lighting also shape the scope. Identify what can remain, what must be rebuilt and which selections are provisional before comparing proposals.

Design decisions

Design options we're asked about most

  • Connected living rooms versus a larger uninterrupted space
  • Built-in storage that preserves circulation and daylight
  • A coherent floor and trim language across adjacent rooms
  • A printed feature wall aligned with furniture, shelving and lighting

Questions

Straight answers.

01

Is this different from interior design?

Yes. Interior design selects and arranges; interior remodeling changes the physical fabric — walls, joinery, floors, electrical. We do the construction side and work with designers where you have one.

02

Can you remove this wall?

Possibly. We survey it, and where it is load-bearing we design a beam and load path, get it engineered and permitted, and build it properly.

03

Do you build joinery in house?

We design and specify joinery and manage fabrication and installation, so the reveals and tolerances drawn are the ones installed.

04

Can a printed feature wall be added to an existing room?

Yes, provided the substrate can be prepared properly. Preparation to a high finish level is most of the work — printing shows every defect underneath.

05

Which Los Angeles permit authority reviews my project?

LADBS reviews building work within the City of Los Angeles; incorporated cities such as Burbank, Glendale and Pasadena have their own departments. Unincorporated properties follow the applicable county process. Required approvals depend on the parcel and proposed work and are confirmed during design, not inferred from a neighborhood name.

06

Can interior work be staged while we stay at home?

Sometimes rooms can be separated into work zones, but dust, noise, electrical shutdowns and shared routes still need planning. Discuss safe access and essential services before choosing phasing. Working around occupied rooms can add duration and protection costs; it is not automatically the simpler option.

07

What warranty information should I ask for before work starts?

Ask for the written workmanship terms, product warranties, exclusions and the process for reporting a concern. Coverage and duration depend on the agreement and specified products; do not assume a universal term. Keep the scope, approvals and care instructions with your handover records.

08

How should I check insurance before a remodel?

Request current insurance documentation and confirm that it applies to the agreed work before signing. Discuss any homeowner-policy requirements with your own insurer, including occupancy and temporary accommodation. A website description is not evidence of coverage; the project documents need to answer that question.

Start Here

Thinking about remodeling? Start with a conversation.

Tell us the room, the street and roughly when. We'll come back with a realistic range and the next honest step.

Call Now(833) 332-6774Free Estimate