Home · Services · Bathroom Remodeling
Bathroom Remodeling
Deco Print Renovations designs and builds Los Angeles bathrooms from the waterproofing outward. Floor falls, membrane laps, tile backing and ventilation are resolved first; design time then goes into layout and joint setting-out, so stone, tile and glass land where they were drawn. Finishes are the last decision, not the first.
Overview
A bathroom is the most technically demanding small room in a house. Everything you can see depends on things you cannot: fall in the floor, membrane laps, backing behind the tile, ventilation that actually moves air.
We design bathrooms from the waterproofing outward, then spend the design time on layout and joint setting-out so that stone, tile and glass land where they were drawn.
What's included
- Layout design, elevations and fixture schedule
- Waterproofing design and flood testing
- Plumbing, electrical and mechanical ventilation coordination
- Framing changes, niches, benches and curbless thresholds
- Tile and stone setting-out drawings before ordering
- Custom glass, including in-house printed panels
- Permits and inspections where required
01 / Design phase
Design before demolition.
Bathroom design begins with layout, drainage, waterproofing and ventilation. Fixtures, tile setting-out, niches, glass and lighting are coordinated with the room’s structure. Printed glass is assessed for the actual application; the print does not replace a suitable glass or waterproofing specification.
02 / Build phase
A sequence the room can support.
The build coordinates strip-out, any required framing and rough services, then waterproofing and the specified testing before tile and fixtures. Glass measurement and fabrication need their own time in the sequence. Access to another bathroom, curing requirements and inspection points belong in the construction plan.
Method
Our process for bathroom remodeling.
Consultation — Review the address, photographs, goals, access and budget priorities. Establish the scope and which information is still needed.
Design — Develop the preferred direction and coordinate the details. Curbless showers assessed against floor depth and drainage. Record selections, material suitability and any proof approvals.
Permits — Confirm the authority and approvals required for the actual work. Coordinate technical documents and procurement; a decorative finish may not require a permit, but associated work can.
Build — Follow the agreed scope and sequence, with required inspection points and written approval of changes. Protect adjacent rooms and schedule bespoke finishes around final measurements.
Reveal — Review the completed scope, address the punch list and explain the care instructions, product information and written warranty terms that apply.
Discover
Understand who uses the room and when, review existing plumbing positions and constraints.
Design
Layout, fixture selection, tile and stone setting-out, glass and lighting design.
Plan
Permit submission where required, trade sequencing, material lead-time planning.
Build
Strip-out, framing, rough plumbing and electrical, waterproofing and flood test, then tile and stone.
Finish
Glass templating and installation, fixtures, sealing, punch list and handover.
Los Angeles
Considerations here, specifically.
Permit rules, review times and requirements vary by city and by scope. We confirm the current path for your address during design.
- Moving a toilet or shower drain means opening the floor structure. On a slab that is a different job to a raised floor, and it changes both cost and duration.
- Curbless and wet-room floors need fall built into the structure. Retro-fitting that into an existing floor is possible but has to be designed, not improvised.
- Glass is templated after tiling, so there is always a gap between a room looking finished and being usable. Plan for it.
- Permit requirements vary by city and scope; plumbing, electrical and structural changes typically require them. We confirm with the local department during design.
- A single bathroom remodel commonly runs several weeks on site once materials are on hand, but this varies with scope, substrate condition and lead times.
Planning
Timeline & cost drivers
Plan for several weeks on site for a full bathroom once materials are available. Design and any permit review happen before that window. Drain relocation, damaged framing, waterproofing tests and curing can extend the work; bespoke glass is measured after tile and needs its own fabrication time.
Keeping fixtures near existing drains usually involves less intervention than changing the plan. Slab cutting, curbless floor construction, waterproofing details, tile size and setting-out, custom glass and ventilation routes shape cost. Resolve these technical items before comparing fixture finishes or decorative upgrades.
Design decisions
Design options we're asked about most
- Curbless showers assessed against floor depth and drainage
- A freestanding bath versus a larger shower within the same footprint
- Large-format tile with deliberate joints, niches and edge details
- Printed glass in a suitable enclosure, or a graphic panel in a dry zone
Questions
Straight answers.
01What is included in the bathroom design phase?
The scope can cover layout, fixture selection, tile setting-out, lighting, glass and coordination of drainage, waterproofing and ventilation. The proposal identifies the actual deliverables before the build is scheduled.
02How long is a bathroom out of service?
For a full remodel, plan on several weeks of on-site work, and longer where drainage moves or the substrate turns out to be damaged. Waterproofing and curing steps cannot be compressed, and glass arrives after tiling. We give you a dated programme before the build.
03Is a curbless shower possible in my home?
Often, but it depends on your floor structure. Raised timber floors can usually be re-framed to build fall in; a concrete slab may need cutting or a raised floor build-up elsewhere. We establish this during survey, before it becomes a design promise.
04Do you do the waterproofing yourselves?
Yes, and we flood test it before any tile goes down. Nearly every bathroom failure we are asked to repair traces back to waterproofing that was rushed or never tested.
05Can glass be printed or patterned?
Yes. We print on glass in house, which means shower screens and partitions can carry a gradient, pattern or custom artwork proofed against the room's actual finishes.
06Which Los Angeles permit authority reviews my project?
LADBS reviews building work within the City of Los Angeles; incorporated cities such as Burbank, Glendale and Pasadena have their own departments. Unincorporated properties follow the applicable county process. Required approvals depend on the parcel and proposed work and are confirmed during design, not inferred from a neighborhood name.
07What warranty information should I ask for before work starts?
Ask for the written workmanship terms, product warranties, exclusions and the process for reporting a concern. Coverage and duration depend on the agreement and specified products; do not assume a universal term. Keep the scope, approvals and care instructions with your handover records.
08How should I check insurance before a remodel?
Request current insurance documentation and confirm that it applies to the agreed work before signing. Discuss any homeowner-policy requirements with your own insurer, including occupancy and temporary accommodation. A website description is not evidence of coverage; the project documents need to answer that question.
Plan this project
Start Here
Thinking about remodeling? Start with a conversation.
Tell us the room, the street and roughly when. We'll come back with a realistic range and the next honest step.